Our Portfolio - Heathrow Airport, World Business Centre - To replace one of the buildings air cooled chillers

Project: To replace one of the buildings air cooled chillers with a York 450Kw chiller, incorporating six scroll compressors. The contract included for:

  1. Disconnection and removal of the redundant McQuay screw chiller, crane removal of same and replacement with new chiller unit
  2. Siting of the replacement York chiller and adaptations to the incoming electrical supplies.
  3. Adaptations to existing pipework and valve arrangements and connections to suit new chiller, and then lagged with PIB insulation.
  4. Controls adapted to enable the new and existing chiller to be sequenced for lead lag change over, and connection to the existing BMS system.
  5. Testing, commissioning and handover.

Design Consultant: JE Evans Associates
Equipment manufacturer: York (Johnson Controls) Model YLAE 0450 SE
Principle Contractor: Coolex Ltd
Completion date: December 2007

Existing redundant chiller crane lifted from roof New chiller craned into position Completed chiller installation Completed chiller installation Completed chiller installation Completed chiller installation

Project: Replacing one of the buildings air cooled chillers with a York 450Kw chiller, incorporating six scroll compressors.
Site: Heathrow Airport, World Business Centre


Accreditations
The Heathrow Club
Project: Replacing one of the buildings air cooled chillers with a York 450Kw chiller, incorporating six scroll compressors.
Site: Heathrow Airport, World Business Centre
Contact us

Name:

Telephone:

Email:

Enquiry:


Enter the pin number you see below:
 

The Heathrow Club
Project: Replacing one of the buildings air cooled chillers with a York 450Kw chiller, incorporating six scroll compressors.
Site: Heathrow Airport, World Business Centre