
Louis Vuitton, Bond StreetSite: Louis Vuitton new flagship store, Bond Street
Project: Mechanical and HVAC installations associated with the forming of the new flagship store
Groucho Club, SohoProject: Supply and install lighting and four Sanyo ceiling suspended split units in the Kitchen
Guardian Newspress, StratfordProject: Installation of destratification fans and ductwork in print hall, and gas fired space heater in loading bay
Site: Guardian Newspress, Stratford
The Kensington Hotel, Doyle GroupSite: The Kensington Hotel, Doyle Group, South Kensington
Project: Mechanical and electrical installations associated with the major refurbishment
Mahiki ClubProject: We carried out the mechanical and electrical works.
Saint Hill ManorProject: We were appointed to undertake the mechanical and HVAC works associated with the manor house and outbuildings refurbishments and the new build garage with close control system.
Eurotunnel, Folkestone, Kent (2008)Project: Replacement Chiller serving RCC Control Buidling
Site: Eurotunnel, Folkestone, Kent
Eurotunnel, Folkestone, Kent (2009)Project: Replacement Chiller serving Longport Police Station
Site: Eurotunnel, Folkestone, Kent
EuroTunnel PWC Chiller ReplacmentsProject:To Replace the (6no,30kw) aged chillers that serve various essential equipment rooms in both UK & French sites.
Eurotunnel Gas Detection SystemsProject: Our project was to replace the aged R22 refrigerant leak detection systems in both UK & France tunnel cooling plants.
Eurotunnel Longport Reception Building-2011Site: Eurotunnel, Folkestone, Kent
Principle Contractor: Coolex Limited
Completion: November 2011
The Brompton Members Club, KensingtonSite: The Brompton Members Club, Kensington
Project: Mechanical and electrical installations associated with the forming of the new nightclub
Marylebone HotelSite: Marylebone Hotel, Off Oxford Street, London
Project: To replace the existing booster pumps with new inverter driven arrangement.
7, Rue Lobineau, ParisProject: We were appointed to undertake the HVAC, Plumbing, Drainage and Electrical works associated with this change of use from shop to wine bar.
Channings SchoolProject: The decommissioning of the aged oil fired boilers and associated plant, refurbishment of plant room and then installation of new Hamworthy gas fired (600kw combined) boilers.
Nash HouseProject: The replacement of 33no CW and LPHW fan coil units on floors LG,G,1,4 & 5 with units as manufactured by ability projects and fitting of modular commissioning sets to new fan coil units.
Experimental Cocktail Bar, China TownProject: Our Works included complete mechanical and electrical installations.
QEQM Hospital,Margate-December 2011We have supplied and installed water booster sets in the plant room serving the maternity block.
Queensbury HouseProject: The decommissioning and removal of the aged gas fired boilers, calorifiers and plant within the central plant room.
The Punchbowl Pub,MayfairProject: We carried out mechanical, electrical and lighting works associated with the refurbishment works to the 1st and 2nd floor areas,new kitchens,toilets etc and change of use to dining area.
Herron Court, BromleySite: Residential block of flats in Bromley
Project: Replacing the existing distribution pipework, boilers and associated plant in that were beyond economical repair.
Lenham Storage KentProject: Installation of cooling and heating for storage.
Site: :Lenham, Storage, Kent
Building: Warehouse
Lambeth CrematoriumProject: Our brief was to integrate a plate heat exchanger incorparated to the new cremator to the boiler circuit to automatically provide heating to the chapel during periods when cremator in use.
Residential block of flats in Notting HillSite: Residential block of flats in Notting Hill
Project: Strip out and remove existing oil fired boilers and associated plant
Offices at Gatwick AirportProject: Provision of comfort cooling to serve tenanted offices.
Site: Gatwick Airport
Building: 1960's Office Block
Kent Fire and Rescue HeadquartersSite: Kent Fire and Rescue Headquarters
Project: To provide cooling and heating in new mobile office
Sevenoaks 8 Storey Office BlockProject: Cooling of server room on 7th floor
Site: 8 storey office block in Sevenoaks
Principle contractor: Coolex Ltd
Heathrow Airport, World Business CentreProject: Replacing one of the buildings air cooled chillers with a York 450Kw chiller, incorporating six scroll compressors.
Site: Heathrow Airport, World Business Centre

Louis Vuitton, Bond Street
Site: Louis Vuitton new flagship store, Bond Street
Project: Mechanical and HVAC installations associated with the forming of the new flagship store

Louis Vuitton, Bond Street
Site: Louis Vuitton new flagship store, Bond Street
Project: Mechanical and HVAC installations associated with the forming of the new flagship store